OKRC 업무보고
(Form 3 v1.0 18. 01. 05)
Task Code: 18-002-RD-02
Task Name: PRISM 2.0/ADOxx
Charge: MR
Phase: 2.0
Level: C
Security:
Distribution: MK, MR, JS
Date: 2018-02-26
Wkly: [Plan],[Do],[Check]
Title: PRISM2.0 개발
I. [Long Term PLAN 2018-02-26]
1. Purpose (목적)
1) Composition of two systems EMS and HCS
2. Goal (목표)
1) n:2 Lattice execution
2) show arrows connection by subsets
3) composition
3. Schedule (일정)
January | February | March | April | Jun | July |
n:2 Lattice | composition | | | | |
positions’s algorithm subsets representing | composition two systems | | | | |
II. [Short Term PLAN 2018-02-26]
1. Sort Term Task Goal
1) Comprehensive exam
a) Studying for exam
2. Short Term Schedule
Weekly Plan | Mon | Tue | Wen | Thu | Fri | Sat |
PRISM 1.0 | 1) a) | 1) a) | 1) a) | 1) a) | 1) a) | |
Charge | MR | MR | MR | MR | MR | MR |
2. Discussion and Confirmation
1) Stored in the archive and Posted at the board.
-The End-
III. DO [2018-03-01]
1. Sort Term Task Goal
1) Comprehensive exam
a) Studying for exam
2. Discussion and Confirmation
1) Stored in the archive and Posted at the board.
-The End-
IV. CHECK [2018-03-02]
1. Sort Term Task Goal
1) Comprehensive exam
a) finish exam
2. Discussion and Confirmation
1) Stored in the archive and Posted at the board.
-The End-
-The End-